Remodel Rough Plumbing
Rough-in and trim-out for a bathroom or kitchen remodel: moving drains and vents, running supply, setting the tub or shower pan, and passing inspection.

Moving a toilet two feet means moving a drain and a vent, and the vent is the part that fails inspection when somebody skips it.
We work off the plan and to the schedule. The rough passes, or we come back before your tile does.
What you get
- +Permit drawings and inspection coordination
- +Vent work done properly, not fudged
- +Trim-out scheduled around the tile and cabinet trades
More in Fixtures & Remodels
Toilet Repair & Replacement
Rebuild kits, flange and wax ring repair, and full toilet replacement including haul-away of the old unit.
Faucet & Fixture Installation
Kitchen and bath faucets, filtered taps, pot fillers, hose bibs, and angle stops, with the old supply valves replaced rather than reused.
Shower Valve Replacement
Replacement of a worn or leaking shower or tub valve with a pressure-balanced cartridge valve, accessed from behind wherever possible.